EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (853)
Research
Workshop
- (13)
Fuselage
- (384)
Firewall
- (21)
Tail Feathers
- (167)
Wings
- (87)
Controls
- (22)
-
38-10 Rudder and...
-
38-10 Rudder and...
-
38-10 Rudder and...
-
38-8 Rudder Pedals...
-
38-10 Step 1
-
39-5 Control System...
-
39-4 Control System...
-
40-3 Flap System step 1
-
40-5 Flap System...
-
40-6 Flap System...
-
39-9 Control System:...
-
39-8 Control System...
-
39-5 Control System...
-
39-4 Control System...
-
39-7 Control System...
-
39-6 Control System...
-
39-3 Control System...
-
40-4 Flap System...
-
40-2 3 Flap Systems...
-
38-5 Step 1-3 Rudder...
-
38-4 Step 1-6 Rudder...
-
38-3 Step 1-5 Rudder...
Avionics
- (11)
Electrical Syst.
- (3)
Instrument Panel
- (5)
Landing Gear
- (19)
Engine
- (21)
Propeller
- (2)
Fuel System
- (9)
Interior Finish
- (17)
Paint / Decals
- (1)
Inspection
Tools
- (3)
Auto Entry
SB & Letters
- (14)
Equipments
- (2)
Brake System
- (31)
Doors
- (21)
Builder Name:
paolo cavosi
-
Project:
Vans - RV-10
Total Hours:
2445.7
Total Flight Time:
Start/Last Date:
May 28, 2019 - No Finish Date
Engine:
IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:
MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=I-CAVS
Home or Last Project Picture
May 27, 2021
39-8 Control System step 1
- (3 hours)
Category: Controls
Pretty long work to adapt bushing (reaming) and the WD-1011 Left and Right in order to comply with the indications (Pivot tube of the WD-1011 has to be 1/32-1/16" SHORTER than the control stick base bushing.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.